| Commercial Transport Procedures Manual |
The Commercial Transport Procedures Manual has been updated. |
2026/04/01 |
| CT Notice 03-25 |
Height Clearance Tool Access |
2025/08/14 |
| Commercial Transport Procedures Manual |
Updates to Chapter 3 and 5 for the Commercial Transport Procedures Manual now available |
2025/06/27 |
| CT Notice 01-25 |
Discontinuation of Fax Machine at the Provincial Permit Centre |
2025/03/14 |
| CT Notice 02-24 |
Notification of Oversize Permit Restrictions for Travel on Highway 97 between Summerland and Peachland |
2024/12/24 |
| Commercial Transport Procedures Manual |
Commercial Transport Procedures Manual updates now available |
2025/06/05 |
| CT Notice 01-22 |
Oversize and Overweight Restrictions for Hwy 1 Between Hope and Spences Bridge |
2023/12/22 |
| CT Notice 06-21 |
Removal of Oversize Permit Restrictions for Travel on Hwy 3, Hwy 1 and Hwy 5A |
2022/02/18 |
| CT Notice 04-21 |
Height Clearance Tool Migration |
2021/11/04 |
| CT Notice 01-21 |
Addition of National Day for Truth and Reconciliation to General Holiday Travel Restrictions |
2021/08/09 |
| CT Notice 06-20 |
Planned Systems Outage from Saturday, November 28th, 2020 at 6:00 pm PST until Sunday, November 29th, 2020 at 6:00 pm PST |
2020/11/25 |
| CT Notice 05-20 |
Planned System Outage 6 pm October 27th to 6 pm October 28th Will Interrupt the Issuing of Overheight and Overwidth Permits |
2020/10/19 |
| CT Notice 04-20 |
Notification of Transportation Permit System (TPS) Down Time |
2020/08/24 |
| CT Notice 03-20 |
Increased Steer Axle Weight and Changes to the Permitting Process for 9-Axle Logging Trucks Approved for Permits Under Letter of Authorization |
2020/06/23 |
| CT Notice 01-20 |
Form CVSE1052 has been amended – RCMP Signatures are no longer required |
2021/05/19 |
| CT Notice 07-19 |
Partial Routing with Extraordinary Load Approvals |
2019/11/21 |
| CT Notice 06-19 |
Removal of the "Beetle Killed" Wording from Logging Wide Bunk Permit Policy |
2019/10/17 |
| CT Notice 04-19 |
New Contact Number for Extraordinary Load Approvals |
2019/07/15 |
| CT Notice 03-19 |
Overall Width Restriction During Construction on the Carolin Bridge on Highway 5 |
2019/07/05 |
| CT Notice 05-18 |
Effective January 15, 2019, carriers must have a signed Form CVSE1053 on file with the Provincial Permit Centre before obtaining extraordinary load permits that have bridge crossing conditions as part of their approval. |
2018/12/11 |
| CT Notice 04-18 |
Reminder That Axles Within the Drive Axle Group Must Be Connected to the Power Source of a Motor Vehicle |
2018/11/07 |
| CT Notice 03-18 |
Request For Participants In A Pilot Program To Evaluate Automatic Lift Devices Set To Deploy Under Pre-Determined Loads On Trailers |
2018/06/05 |
| CT Notice 02-17 |
Highways 5 and 16 between Kamloops and the Alberta border is re-opened with caution to Extraordinary Load traffic |
2017/07/20 |
| RoadSafetyBC Notice |
Use of Electronic Devices While Driving Guide |
2017/02/22 |
| CT Notice 02-15 |
90 Day Notice of changes to CVSE Forms 1002 and 1003 |
2015/12/18 |
| CT Notice 01-15 |
FMCSA Medical compliance - Class 5 drivers operating commercially in U.S. |
2015/10/22 |
| CT Notice 07-14 |
Letters of Authorization For Extended Length Super B-Trains Hauling Wood Chips and Mill Processed Wood
Residuals |
2014/11/07 |
| CT Notice
05-14 |
Clarification regarding Compliance Circular 07/11 Steer Axle Weight Limits (July 1, 2011) |
2014/06/19 |
| CT Notice
03-14 |
Cancellation of the planned Weight Reduction for Quad Axle Full Trailers. |
2014/03/30 |
| CT Notice 10-13 |
Postponement of the Scheduled Trailer Weight Reductions |
2013/12/23 |
| CT Notice 09-13 |
Pacific Gateway - OS-OW Vehicle Envelopes |
2013/10/18 |
| CT Notice
07-13-Revised |
REVISED - Reminder of Drawbar and Hitch offset Requirements for Straight truck and Full Trailer
combinations - Appendices B and F of the Commercial Transport Regulation (CTR) |
2013/09/27 |
| CT Notice
05-13 |
CVSE would like to thank everyone who took the time to contribute their input, in person or online, to
the Mobile Traffic Control and Pilot Vehicle Review. We appreciate your assistance! |
2013/08/01 |
| CT Notice
10-12 |
Letters of Authorization for Beetle Killed Wood |
2012/12/20 |
| CT Notice 09-12
|
AMENDMENT - Postponement of the Scheduled Trailer Weight Reductions |
2012/12/11 |
| CT Notice 08-12
|
Postponement of the Scheduled Trailer Weight Reductions |
2012/12/07 |
| CT Notice 05-12 |
A new user-friendly information website for the trucking industry is now available. |
2012/06/14 |
| CT Notice 02-12
|
Amendment to Letters of Authorization for Short Logs, Long Logs and
Wide Bunk Beetle Killed Wood. |
2012/06/11 |
| CT Notice 04-12 |
NOTICE: Amendment Notice of Postponement of Scheduled Trailer Weight Reductions |
2012/05/24 |
| CT Notice
06-11 |
NOTICE: Postponement of Scheduled Trailer Weight Reductions |
2011/12/06 |
| CT Notice 20111027
|
NOTICE: Commercial Vehicle Right Lane Only Use in PMH1 Project Corridor |
2011/10/27 |
| CT Notice
05-11 |
NOTICE: Speeding Up Over Weight Permit Approvals Requiring Bridge Review.
Effective July 2011, the 30 day approval time limit issued by Bridge Engineering Branch was increased to
90 days. This change is anticipated to reduce the number of requests for time extensions by 90 percent,
improving efficiencies for industry and government. |
2011/10/13 |
| CT Notice 04-11
|
NOTICE: Tips for speeding up over weight permit approvals requiring bridge review.
UPDATED REFERENCE: Commercial
Transport Procedure Manual Chapter 6 Heavy Haul and extraordinary Loads - Section
6.4.3.Ciii.
See form CVSE1049.
|
2011/09/22 |
| CT Notice 02-11 |
Intent to defer the enactment of the scheduled trailer weight reductions. |
2011/08/04 |